Track Laying System on the Northeast Corridor, 1970s.
Color slide showing Amtrak employees installing concrete ties on the Northeast Corridor; image likely dates to the late 1970s or early 1980s.
- Film Slide Details
-
- Date Archived:
- July 8, 2015
- Geography:
- Northeast
- Decade:
- 1970s
- Data Format:
- Image
- Download the full-sized version of this photo
Amtrak work crews operate the Track Laying System, a series of machines that moved along the rails and replaced ties, installed continuous welded rail, cleaned ballast and aligned the track. It could cover up to a mile per day. Here, new concrete ties are being installed, possibly as part of the Northeast Corridor Improvement Project.
Photographer: Unknown for Amtrak. From the Amtrak Corporate Collection.